Who this is for: Data centre operators (enterprise and colocation), energy auditors, sustainability consultants, EU Notified Bodies, national competent authorities, and anyone responsible for Article 12 reporting or Article 11 energy audit compliance under the EED recast.

Why this matters now. The EU adopted the A-to-G data centre sustainability rating scheme on 21 September 2026 (C(2026) 3472). First labels will be generated from reported data starting 15 August 2027. The public consultation on binding minimum performance standards closes 14 December 2026. Operators who cannot produce verifiable evidence of their PUE, WUE, ERF, and REF face both rating penalties and upcoming performance mandates.

PENALTY CONTEXT: Penalties are set by Member States. France has set fines up to EUR 50,000 per data centre for non-compliance with reporting obligations. Germany's EnEfG requires data centres above 300 kW to report -- a lower threshold than the EU's 500 kW -- with binding PUE limits carrying separate sanctions. Member State penalties vary

Contents

1. Overview 2. Who Must Comply 3. Article 12: Data Centre Reporting 4. The Four Sustainability Indicators 5. Delegated Regulation 2024/1364 6. Measurement Standards (EN 50600-4) 7. A-to-G Rating Scheme 8. Article 11: Energy Audits 9. Demand Response and Grid Services 10. Coverage Matrix 11. Killer Scenarios 12. Member State Variations 13. Cross-References (CSRD, Taxonomy, AI Act) 14. AI Workload Gap 15. Quick Start 16. Key Dates 17. References

1. Overview

Directive (EU) 2023/1791 -- the Energy Efficiency Directive recast ("EED III") -- entered into force on 10 October 2023, replacing Directive 2012/27/EU. It was published in OJ L 231 on 20 September 2023. The transposition deadline for Member States was 11 October 2025.

Article 12 introduced mandatory energy efficiency reporting for data centres. This crosswalk maps 20 SWT3 witness procedures to EED obligations, covering:

SWT3 does not file your Article 12 report. It provides a cryptographic evidence chain for the metrics you report -- proving that PUE readings, water consumption figures, renewable energy percentages, and grid flexibility participation are recorded, timestamped, and independently verifiable. When an auditor or national competent authority asks "how do you know your PUE is 1.28?", the SWT3 anchor is your answer.

2. Who Must Comply

The 500 kW Threshold

Article 12(1) applies to owners and operators of data centres with installed IT power of at least 500 kW. "Installed IT power" means the sum of nameplate power demand for servers, storage, and networking equipment within the computer-room floor area. This is explicitly not total site load, UPS capacity, grid connection capacity, or revenue.

Facility Types

The Delegated Regulation distinguishes three types:

Colocation-Specific Provisions

Colocation operators receive exemptions under the Delegated Regulation: they may extrapolate storage capacity based on 90% of installed power demand, and receive exemptions for the first two reporting periods for certain tenant-level metrics they cannot directly measure. This is a practical concession -- a colocation operator cannot meter every tenant's individual server utilization.

Exemption

Article 12(2): Data centres used for, or providing services exclusively with the final aim of, defence and civil protection are exempt.

SUBMISSION ROUTE: Operators submit via their national reporting scheme if one exists. Otherwise, operators submit directly to the European Energy Efficiency Database. Germany, France, and Ireland have established national schemes. Check your national competent authority.

3. Article 12: Data Centre Reporting

Article 12(1) -- Mandatory Reporting

Operators above 500 kW must make Annex VII information publicly available and communicate it to the European database. The first practical reporting deadline was 15 September 2024 (the Delegated Regulation entered into force on 6 June 2024, after the directive's original 15 May date). Subsequent reports are due 15 May annually.

Article 12(3) -- European Database

The Commission established the European Energy Efficiency Database for data centres. Individual site data is confidential; only aggregated data (by Member State and size class) is publicly available.

Article 12(4) -- Code of Conduct

Operators at or above 1 MW are encouraged to adopt the European Code of Conduct on Data Centre Energy Efficiency (current version). This is not mandatory, but the rating scheme label includes a Code of Conduct adherence indicator.

Article 12(5) -- Commission Assessment

Based on first-round data, the Commission published COM(2026) 500 on 21 September 2026. Key findings: 770 data centres reported (approximately 36% of estimated 2,100+ sites), average PUE 1.36, and 70.1% of data judged reliable. This report triggered both the rating scheme and the minimum performance standards consultation.

HBOM-PUE.1 -- Power Usage Effectiveness Attestation

Maps to Article 12(1), Delegated Reg Annex III (PUE)

Witnesses reported PUE with total facility power and IT load measurements. The anchor records total facility energy (E_DC), IT equipment energy (E_IT), and the calculated PUE ratio. PASS when IT load is reported and PUE is physically valid (>= 1.0).

Assessor note:

Verify PUE measurement follows EN 50600-4-2. Confirm E_DC includes ALL facility energy: cooling, lighting, UPS losses, security systems, fire suppression -- not just IT load. E_IT must be measured at UPS output, not PDU output (PDU measurement understates overhead). Cross-reference anchor values against utility invoices. The reported PUE must be an annual average, not a spot measurement or design PUE. Check for seasonal variation -- a single winter reading will understate true PUE.

HBOM-WATER.1 -- Water Consumption Witnessing

Maps to Article 12(1), Delegated Reg Annex III (WUE)

Witnesses reported water consumption with WUE ratio and water source classification. Records litres consumed, WUE ratio (litres per kWh of IT energy), and source type (municipal, recycled, rainwater, groundwell, or mixed).

Assessor note:

Verify WUE calculation uses litres per kWh of IT energy per EN 50600-4-9, not total facility energy. Confirm water source classification is accurate -- this matters for the rating scheme label. Adiabatic and evaporative cooling towers are the primary water consumers; verify metering exists on cooling water circuits. Air-cooled facilities may report zero water consumption, which is valid but should be confirmed against cooling system design documentation. Check whether potable vs non-potable water is distinguished -- Delegated Regulation Annex II requires this breakdown.

HBOM-THERM.1 -- Thermal Profile Attestation

Maps to Delegated Reg Annex II (temperature set points)

Witnesses reported thermal measurements with threshold alerting. Records ambient temperature, component/exhaust temperature, and whether threshold conditions are exceeded. PASS when readings are within acceptable bounds.

Assessor note:

Verify temperature set points align with ASHRAE TC 9.9 A1/A2 recommended envelopes (18-27C inlet). Delegated Regulation Annex II requires both inlet and outlet temperature reporting. Check for hot aisle/cold aisle containment -- mixed readings from uncontained environments produce unreliable PUE calculations. If the operator claims high inlet temperatures (above 27C) as an efficiency measure, verify this is intentional and documented, not a cooling failure.

HBOM-INV.1 -- Hardware Inventory Attestation

Maps to Delegated Reg Annex II (installed IT capacity, server/storage counts)

Witnesses the hardware component inventory with manifest hashing and baseline delta. Records component count, manifest hash, and changes since last attestation.

Assessor note:

The Delegated Regulation defines "installed IT power" as the sum of nameplate power for servers, storage, and networking. This is NOT UPS capacity, NOT grid connection capacity. Colocation operators should report tenant-installed capacity, not total rack provision. Verify the inventory manifest includes all three equipment categories (compute, storage, network). Check that decommissioned equipment is removed from the installed power calculation -- ghost assets inflate the denominator and artificially improve PUE.

4. The Four Sustainability Indicators

Delegated Regulation 2024/1364 Annex III defines four sustainability indicators calculated from Annex II data. Each has a corresponding SWT3 procedure that provides the evidence chain.

IndicatorFormulaUnitSWT3 Procedure
PUE (Power Usage Effectiveness)E_DC / E_ITDimensionless ratioHBOM-PUE.1
WUE (Water Usage Effectiveness)Water input / E_ITlitres / kWhHBOM-WATER.1
ERF (Energy Reuse Factor)E_REUSE / E_DCRatio (0 to 1)See gap note below
REF (Renewable Energy Factor)E_RENEWABLE / E_DCRatio (0 to 1)ADR-CARBON.1
ADR-CARBON.1 -- Carbon Credit / REC Attestation

Maps to Delegated Reg Annex II (renewable energy breakdown) and Annex III (REF)

Witnesses carbon credit and renewable energy certificate issuance. Records credit type (1=REC, 2=carbon offset, 3=EAC, 4=Guarantee of Origin), quantity in MWh, and registry identification hash. The Delegated Regulation requires renewable energy to be broken down by Guarantees of Origin, Power Purchase Agreements, and on-site generation -- all three map to ADR-CARBON.1 credit types.

Assessor note:

Verify Guarantees of Origin (GoOs) certificates are time-matched to the reporting period. PPA documentation must specify temporal granularity: annual matching is the current EU standard, but Ireland requires hourly matching for new grid connections and Germany's EnEfG requires matched sourcing. On-site generation requires separate sub-metering evidence. Check that REF = E_RENEWABLE / E_DC per the Delegated Reg formula, not E_RENEWABLE / E_IT. Multiple ADR-CARBON.1 anchors (one per credit type) should sum to the total renewable energy claimed.

ERF GAP: There is no dedicated SWT3 procedure for waste heat reuse tracking (the ERF indicator). HBOM-THERM.1 captures thermal profiles and ADR-CARBON.1 captures energy certificates, but neither directly records E_REUSE (waste heat exported to district heating, adjacent facilities, or industrial processes). Operators tracking ERF should use witness.record_raw("HBOM-THERM.1", ...) with supplementary documentation until a dedicated procedure is available. This is flagged as a coverage gap.

5. Delegated Regulation 2024/1364

Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 supplements the EED with the actual reporting template and methodology. Published in the OJ on 17 May 2024, it entered into force on 6 June 2024.

Annex I -- Site Information (7 items)

Data centre name, owner/operator details, location (municipality + NUTS codes), facility type (enterprise/colocation/co-hosting), commissioning date, and electrical and cooling infrastructure redundancy levels.

Annex II -- 24 Key Performance Indicators

Grouped into three blocks:

BlockKPIsSWT3 Procedures
Energy and Sustainability (18 KPIs) Installed IT power, floor areas, total energy (E_DC), IT energy (E_IT), grid services, battery capacity, water input (total + potable), waste heat reused, temperature data, cooling degree days, refrigerant types/quantities, renewable energy (GoOs, PPAs, on-site) HBOM-PUE.1, HBOM-WATER.1, HBOM-THERM.1, HBOM-INV.1, ADR-CARBON.1, DPP-SOH.1
ICT Capacity (2 KPIs) Server capacity (SERT-based), storage capacity HBOM-INV.1, AI-HW.1
Data Traffic (4 KPIs) Incoming/outgoing bandwidth, incoming/outgoing data traffic AI-PERF.1

REFRIGERANT GAP: Annex II requires reporting of refrigerant types and quantities. There is no dedicated SWT3 procedure for refrigerant tracking. Operators should document refrigerant inventory alongside thermal profile attestations. This is flagged as a coverage gap.

6. Measurement Standards (EN 50600-4)

The Delegated Regulation references the EN 50600-4 series for measurement methodology. Auditors will verify that reported values follow these standards.

StandardMetricKey Requirement
EN 50600-4-2PUEMeasurement at UPS output, annual average, all facility loads included
EN 50600-4-3REFRenewable energy factor methodology, GoO/PPA/on-site breakdown
EN 50600-4-5ERFEnergy reuse factor, waste heat metering at facility boundary
EN 50600-4-9WUEWater usage per kWh IT energy, source classification

MEASUREMENT POINT MATTERS: PUE measured at UPS output vs PDU output can differ by 0.05-0.15 points. The Delegated Regulation specifies UPS output as the standard measurement point. An operator reporting PUE 1.25 at PDU level may actually be PUE 1.35 at UPS level -- enough to drop from rating class B to class D. Auditors should verify which measurement point is used.

7. A-to-G Rating Scheme

Adopted 21 September 2026 via C(2026) 3472, the rating scheme assigns sustainability labels to data centres based on reported data. Currently in the parliamentary/council scrutiny period. First labels will be automatically generated from reported data starting 15 August 2027. Labels start Aug 2027

PUE Rating Scale

ClassPUE RangeInterpretation
A≤ 1.15Best-in-class efficiency
B> 1.15 and ≤ 1.25High efficiency
C> 1.25 and ≤ 1.35Good efficiency (near EU average 1.36)
D> 1.35 and ≤ 1.50Average efficiency
E> 1.50 and ≤ 1.70Below average
F> 1.70 and ≤ 1.90Poor efficiency
G> 1.90Lowest efficiency

WUE Rating Scale

ClassWUE (litres/kWh IT)Interpretation
A≤ 0.10Minimal water use (air-cooled or closed-loop)
B> 0.10 and ≤ 0.20Low water use
C> 0.20 and ≤ 0.40Moderate water use
D> 0.40 and ≤ 0.60Above-average water use
E> 0.60 and ≤ 0.80High water use
F> 0.80 and ≤ 1.00Very high water use
G> 1.00Highest water use

Label Content (18 fields)

Each label includes: two A-to-G grades (PUE and WUE), energy mix breakdown (renewables, nuclear, unspecified), LEEF score (Low-Emission Energy Factor), cooling degree days (climate context), grid flexibility status, waste heat reuse readiness, measurement certification level, and a QR code linking to the public database entry.

AI-GOV.1 -- Governance Framework Attestation

Maps to Article 12(4) (Code of Conduct), Rating Scheme (certification level)

Witnesses the existence and version of governance policies. For EU-EED, this maps to documented adherence to the European Code of Conduct on Data Centre Energy Efficiency. The rating scheme label includes a "measurement certification level" field that distinguishes self-reported vs independently audited metrics.

Assessor note:

For operators at or above 1 MW, verify a documented assessment against the current version of the European Code of Conduct exists. The Code of Conduct is voluntary, but its adoption influences the rating scheme label. Check whether the operator has undergone independent third-party verification of their metrics -- this upgrades the certification level on the label from "self-declared" to "verified". An AI-GOV.1 anchor with a governance policy hash provides evidence of the assessment, but does not replace the Code of Conduct Participant endorsement process.

8. Article 11: Energy Audits

Article 11 sets energy audit and management system obligations based on total enterprise energy consumption (all energy carriers, averaged over three years).

ThresholdObligationDeadline
10 TJ average annualEnergy audit every 4 years, conducted by qualified independent expert11 October 2026 Past due
85 TJ average annualImplement energy management system (e.g., ISO 50001)11 October 2027

For context: a 2 MW data centre consuming approximately 13.5 GWh/year equals roughly 48.6 TJ -- well above both thresholds. Most data centres subject to Article 12 (500 kW+) will also be subject to Article 11.

AI-AUDIT.1 -- Audit Trail Attestation

Maps to Article 11 (energy audit compliance)

Witnesses audit completion events with auditor identification, scope, and timing. For EU-EED, this records when the enterprise energy audit was conducted, by whom, and what it covered. The anchor timestamp proves the audit was performed within the required four-year cycle.

Assessor note:

Verify the energy audit covers ALL energy carriers, not just electricity -- gas, diesel (backup generators), district heating/cooling inputs. The 10 TJ and 85 TJ thresholds are averaged over three years. The audit must be conducted by a qualified and accredited expert independent of the facility operator. Check auditor credentials against the Member State's accreditation register. For 85 TJ+ enterprises, verify ISO 50001 certification is current and covers data centre operations specifically, not just the parent organization's offices.

9. Demand Response and Grid Services

The Delegated Regulation Annex II requires reporting on grid services offered and battery capacity available. Data centres are increasingly participating in demand response programs, providing grid flexibility through load shifting, UPS battery dispatch, and on-site generation management.

ADR-EVENT.1 -- Demand Response Event Witnessing

Maps to Delegated Reg Annex II (grid services), Article 12(1)

Witnesses demand response event phases from signal receipt through restoration. Records event type, committed curtailment in kW, and grid operator identification.

Assessor note:

Verify that demand response participation claimed on the rating scheme label ("grid flexibility: Yes") is backed by actual event evidence. Query ADR-EVENT.1 anchors for the reporting period. Check that the grid operator identification matches the relevant TSO/DSO. An operator claiming grid flexibility without event anchors raises a data quality concern.

ADR-BASE.1 -- Baseline Consumption Attestation

Maps to Delegated Reg Annex II (total energy consumption)

Witnesses reported baseline power consumption with measurement methodology. Records baseline power in kW, measurement method (metered 10-day average, regression, real-time meter, or deemed savings), and confidence level.

Assessor note:

The baseline measurement method matters for the accuracy of demand response claims. Real-time metering (method 3) provides the highest confidence. Regression-based baselines (method 2) must account for weather normalization. Check that the confidence level (factor_c) is at least 950 (95%). Baselines established more than 12 months ago should be recalibrated.

DPP-SOH.1 -- Battery State of Health Attestation

Maps to Delegated Reg Annex II (battery capacity offered to grid)

Witnesses reported battery state of health, cycle count, and remaining capacity. Data centres with UPS battery systems participating in grid services must demonstrate their available capacity is as claimed.

Assessor note:

Verify that grid-offered battery capacity does not exceed actual available capacity after accounting for UPS reserve requirements. A data centre claiming 500 kWh of grid-available battery while maintaining a 15-minute UPS reserve must demonstrate the capacity beyond the reserve. Check cycle count against manufacturer degradation curves -- batteries beyond 80% state of health may not deliver claimed capacity.

10. Coverage Matrix

Procedure-to-article mapping across all EU-EED obligations. Check marks indicate which SWT3 procedure provides evidence for which regulatory requirement.

Procedure Art. 12(1)
Reporting
Art. 12(4)
Code of Conduct
Art. 11
Energy Audit
Del. Reg
Annex II
Del. Reg
Annex III
Rating
Scheme
Grid
Services
HBOM-PUE.1✓✓✓✓
HBOM-WATER.1✓✓✓✓
HBOM-THERM.1✓✓
HBOM-INV.1✓✓
HBOM-LIFE.1✓
HBOM-SUPPLY.1✓
ADR-CARBON.1✓✓✓✓
ADR-EVENT.1✓✓
ADR-BASE.1✓✓
ADR-CURT.1✓
ADR-SETTLE.1✓
ADR-GRID.1✓✓
DPP-SOH.1✓✓
DPP-CHRG.1✓✓
AI-GOV.1✓✓
AI-AUDIT.1✓
AI-HW.1✓
AI-ENV.1✓
AI-PERF.1✓
AI-DRIFT.1✓

11. Killer Scenarios

Scenario 1: PUE Rating Divergence

Your hyperscale facility in Frankfurt reports PUE 1.45. Under the EU rating scheme, that is class D -- average efficiency, no immediate action required. But Germany's EnEfG requires existing data centres to achieve PUE 1.3 by 2030 (with an interim target of PUE 1.5 by July 2027). You are compliant with EU reporting but facing a binding national performance standard that the EU directive does not impose. SWT3 witnesses do not change your PUE, but they provide the timestamped evidence chain that proves your improvement trajectory -- or documents the shortfall.

Scenario 2: Threshold Creep

Your enterprise data centre has 480 kW installed IT power. A single rack deployment mid-year pushes you over 500 kW. Are you retroactively liable for the full reporting year? The Delegated Regulation requires reporting for the period in which the threshold is crossed. HBOM-INV.1 anchors with timestamps prove exactly when the threshold was crossed, protecting against claims of prolonged non-reporting. In Germany (300 kW threshold), even smaller expansions trigger reporting obligations earlier.

Scenario 3: Colocation Blind Spot

You operate a 5 MW colocation facility with 200 tenants. The Delegated Regulation exempts you from certain tenant-level KPIs for the first two reporting periods -- but not from facility-level PUE, WUE, or total energy consumption. Your tenants deploy GPU clusters for AI training that increase IT load by 40% in Q3, changing your PUE from 1.30 to 1.55 within a single quarter. Annual PUE averages mask this. HBOM-PUE.1 anchors recorded quarterly (or monthly) provide the granular evidence trail that explains the shift to auditors and prevents rating surprises.

12. Member State Variations

The EED recast is a directive, not a regulation -- Member States transpose it into national law with variations. As of late 2025, only 16 of 27 Member States had adopted transposition measures; infringement proceedings were opened against the rest.

CountryThresholdPUE LimitsRenewablesNotable
Germany (EnEfG)300 kWExisting: 1.5 by Jul 2027, 1.3 by 2030. New (post-Jul 2026): 1.250% by 2024, 100% by 2027Most aggressive. Binding PUE. Mandatory waste heat 10-20%. Annual deadline: 31 March (earlier than EU).
France500 kWNo national limitsEU standardERF target (≥ 0.20 for 1 MW+). Fines up to EUR 50,000.
IrelandGrid applicantsNo national limits80% renewable matching for new connectionsData centre moratorium on new grid connections in Dublin region.
Netherlands500 kWNo national limitsEU standardHyperscale zoning restrictions (spatial planning).
Spain (draft)500 kW / 1 MW gridPUE 1.15 (draft)Hourly matching (draft)Not yet adopted. Draft goes beyond EU.
Sweden500 kWNo national limitsEU standardWaste heat cost-benefit analysis required for 1 MW+.

GERMANY IS THE BENCHMARK: Any data centre operating in Germany faces the most demanding national transposition. The 300 kW threshold captures facilities the EU directive would not reach. Binding PUE limits (1.2 for new builds, 1.3 for existing by 2030) go far beyond the EU's reporting-only approach. 100% renewable electricity by 2027 is a hard deadline. If you operate in Germany, the EU-EED is your floor, not your ceiling.

13. Cross-References (CSRD, Taxonomy, AI Act)

CSRD (Corporate Sustainability Reporting Directive)

Data centre operators subject to CSRD must report under ESRS standards. EU-EED Article 12 data feeds directly into ESRS E1 (Climate Change) disclosures: energy consumption, renewable share, water usage, and GHG emissions. SWT3 anchors for HBOM-PUE.1, HBOM-WATER.1, and ADR-CARBON.1 provide the evidence chain for both EED and CSRD -- witness once, report to both.

EU Taxonomy (Activity 8.1 -- Data Processing, Hosting, and Related Activities)

Data centres can qualify as "Taxonomy-aligned" under climate change mitigation. The technical screening criteria require implementing the European Code of Conduct best practices and meeting PUE thresholds:

These are different thresholds from the rating scheme. A data centre rated "B" (PUE ≤ 1.25) on the EED rating is Taxonomy-aligned. A "C" rating (PUE ≤ 1.35) may or may not be, depending on climate zone. CSRD Article 8 Taxonomy disclosures require demonstrating Activity 8.1 alignment for turnover/CapEx/OpEx reporting.

AI Act (Energy Transparency)

The AI Act includes transparency requirements for General-Purpose AI Models that reference energy consumption reporting. The Commission is developing standards for AI energy efficiency measurement. EU-EED reporting provides the facility-level energy data, while SWT3's AI-specific procedures (AI-HW.1, AI-PERF.1) provide the workload-level evidence. Together they cover both the infrastructure and the application layer.

Related Guides

14. AI Workload Gap

Multiple industry analyses flag that the current EU-EED framework does not adequately address AI-specific energy demands:

SWT3's AI-HW.1 (hardware attestation) and AI-PERF.1 (performance monitoring) procedures capture workload-level energy data that the EU-EED does not yet require. Operators using these procedures today will be ahead of the curve when minimum performance standards introduce workload-specific requirements.

AI-HW.1 -- Hardware Attestation

Supplementary: GPU/TPU workload energy context

Witnesses hardware platform attestation including accelerator type, power draw, and utilization. Provides the workload-level detail that the EU-EED's facility-level metrics cannot capture.

Assessor note:

AI-HW.1 is not required by the current EU-EED. It provides supplementary evidence for operators who want to disaggregate AI workload energy from total facility consumption. Useful for Taxonomy alignment narratives where an operator must demonstrate that AI workloads are energy-efficient at the application level, not just the facility level. Also relevant for AI Act energy transparency requirements (when standards are published).

AI-PERF.1 -- Performance Monitoring

Supplementary: Data traffic and utilization context

Witnesses performance metrics including throughput, latency, and utilization. Maps to the Delegated Regulation's data traffic KPIs (incoming/outgoing bandwidth and data transfer volumes).

Assessor note:

Delegated Reg Annex II requires data traffic reporting (4 KPIs). AI-PERF.1 anchors can evidence these values. Verify that bandwidth and data traffic figures are measured at the facility boundary, not at individual server NICs (which would double-count internal east-west traffic).

AI-ENV.1 -- Runtime Environment Attestation

Supplementary: Infrastructure classification

Witnesses the runtime environment fingerprint at startup: OS, container isolation, and runtime type (bare metal, VM, container, serverless, edge). Provides infrastructure classification evidence for the Delegated Regulation's facility type reporting.

Assessor note:

Use AI-ENV.1 to verify the operator's facility type classification (enterprise vs colocation vs co-hosting). A facility claiming colocation exemptions while running exclusively internal workloads (factor_c = 0 for bare metal, single-tenant) may be misclassified.

AI-DRIFT.1 -- Configuration Drift Detection

Maps to Article 11 (energy management system monitoring)

Witnesses configuration baseline and drift from expected state. For EU-EED, this maps to the continuous monitoring requirement under ISO 50001 energy management systems (required for enterprises above 85 TJ).

Assessor note:

For operators with ISO 50001 EMS, verify that energy performance indicators (EnPIs) are monitored for drift. AI-DRIFT.1 anchors showing configuration baseline and deviation provide evidence of the "monitoring and measurement" clause (ISO 50001 Clause 9.1). A drift detection without corresponding corrective action raises a nonconformity flag under the EMS.

15. Quick Start

Python

from swt3_ai import Witness

witness = Witness(
    agent_id="dc-energy-monitor",
    signing_key="your-signing-key",
    jurisdiction="EU",
    legal_basis="EED-2023-1791-Art12"
)

# Witness PUE reading (quarterly)
witness.record_raw("HBOM-PUE.1",
    factor_a=2450,   # Total facility: 2450 kW
    factor_b=1820,   # IT load: 1820 kW
    factor_c=1346    # PUE 1.346 (x1000)
)

# Witness water consumption
witness.record_raw("HBOM-WATER.1",
    factor_a=142000,  # 142,000 litres consumed
    factor_b=380,     # WUE 0.380 l/kWh (x1000)
    factor_c=1        # Municipal water
)

# Witness renewable energy (Guarantees of Origin)
witness.record_raw("ADR-CARBON.1",
    factor_a=4,       # Guarantee of Origin
    factor_b=850000,  # 8,500 MWh (x100)
    factor_c=0xA1B2   # Registry hash
)

witness.flush()

TypeScript

import { Witness } from '@tenova/swt3-ai';

const witness = new Witness({
  agentId: 'dc-energy-monitor',
  signingKey: process.env.SWT3_SIGNING_KEY,
  jurisdiction: 'EU',
  legalBasis: 'EED-2023-1791-Art12'
});

// Witness PUE reading (quarterly)
witness.recordRaw('HBOM-PUE.1', {
  factorA: 2450,   // Total facility: 2450 kW
  factorB: 1820,   // IT load: 1820 kW
  factorC: 1346    // PUE 1.346 (x1000)
});

// Witness water consumption
witness.recordRaw('HBOM-WATER.1', {
  factorA: 142000,  // 142,000 litres consumed
  factorB: 380,     // WUE 0.380 l/kWh (x1000)
  factorC: 1        // Municipal water
});

// Witness renewable energy (Guarantees of Origin)
witness.recordRaw('ADR-CARBON.1', {
  factorA: 4,       // Guarantee of Origin
  factorB: 850000,  // 8,500 MWh (x100)
  factorC: 0xA1B2   // Registry hash
});

await witness.flush();

16. Key Dates

DateEventStatus
20 Sep 2023Directive published in OJ L 231Done
10 Oct 2023Directive enters into forceDone
6 Jun 2024Delegated Reg 2024/1364 enters into forceDone
15 Sep 2024First data centre reporting deadlineDone
15 May 2025Second reporting deadline (CY2024 data)Done
11 Oct 2025Member State transposition deadlineDone (16/27 compliant)
15 May 2026Third reporting deadline (CY2025 data)Done
21 Sep 2026Rating scheme adopted (C(2026) 3472)Done (scrutiny period)
11 Oct 2026First energy audits due (Art. 11, 10 TJ)Past due
14 Dec 2026Min. performance standards consultation closesUpcoming
15 May 2027Fourth reporting deadline (CY2026 data)Upcoming
15 Aug 2027First A-to-G labels generatedUpcoming
11 Oct 2027EMS required for 85 TJ+ enterprisesUpcoming
Q2 2027Commission min. performance standards proposalExpected

17. References