This Continuous Monitoring Strategy defines the ongoing assessment, monitoring, and reporting requirements for [System Name] operated by [Organization Name]. It establishes monitoring frequencies, metrics, response actions, and reporting cadences to maintain the security authorization granted by the Authorizing Official.
This strategy is developed in accordance with NIST SP 800-137, NIST SP 800-53 CA-7, and the organization's Risk Management Framework implementation.
The system employs a hybrid monitoring approach combining automated continuous assessment with periodic manual review:
NIST 800-53 CA-7(b) requires defined monitoring frequencies per control. Different control types require different monitoring cadences. The following table establishes the frequency and justification for each family.
| Control Family | Frequency | Method | Justification |
| AC (Access Control) | Every 4 hours |
AUTOMATED |
Access violations are high-impact. Continuous scanning detects unauthorized accounts, stale credentials, and privilege changes. |
| AU (Audit) | Every 4 hours |
AUTOMATED |
Audit log integrity is foundational. Automated checks verify log generation, storage capacity, and retention compliance. |
| CA (Assessment) | Every 4 hours |
AUTOMATED |
Continuous assessment is the core CA-7 requirement. Axiom implements this directly via automated scan cadence. |
| CM (Configuration) | Every 4 hours |
AUTOMATED |
Configuration drift detection requires high-frequency monitoring. Changes to baselines are flagged immediately. |
| CP (Contingency) | Quarterly |
MANUAL |
Backup and recovery testing requires physical execution. Attestation-based, reviewed quarterly by ISSO. |
| IA (Identification) | Every 4 hours |
AUTOMATED |
Authentication mechanisms (MFA, password policy) verified continuously via automated probes. |
| IR (Incident Response) | Annually + event-driven |
MANUAL |
IR plan review is annual. Tabletop exercises require human coordination. Event-driven assessment after any incident. |
| MA (Maintenance) | Every 4 hours |
AUTOMATED |
System update status and patch levels verified continuously. |
| MP (Media Protection) | Quarterly |
MANUAL |
Physical media handling requires manual verification. Attestation-based. |
| PE (Physical/Environmental) | Quarterly |
MANUAL |
Physical access controls, facility security, and environmental protections require on-site inspection. |
| PL (Planning) | Annually |
MANUAL |
Security plan review is an annual activity tied to re-authorization cycle. |
| PS (Personnel Security) | Quarterly |
MANUAL |
Background check status and access termination require HR system verification. Attestation-based. |
| RA (Risk Assessment) | Every 4 hours (vuln scan) + Annually (full RA) |
AUTOMATED + MANUAL |
Vulnerability scanning automated daily. Full risk assessment is an annual activity with human analysis. |
| SA (System Acquisition) | Every 4 hours + Quarterly |
AUTOMATED + MANUAL |
Supply chain scanning automated (Trivy 5-layer). Vendor contract review is quarterly. |
| SC (System Communications) | Every 4 hours |
AUTOMATED |
TLS configuration, boundary protection, and network segmentation verified continuously. |
| SI (System Integrity) | Every 4 hours |
AUTOMATED |
Flaw remediation, malicious code protection, and integrity monitoring verified continuously. |
| AT (Awareness Training) | Annually |
MANUAL |
Training completion requires LMS verification. Annual cycle aligned with onboarding and refresher schedule. |
| AI (AI Governance) | Per-inference (real-time) |
AUTOMATED |
SWT3 witness anchors are minted per inference. 43 AI procedures cover model integrity, fairness, explainability, and security. |
| Metric | Source | Threshold | Response Action |
| Sovereign Score | Posture API |
Below 90%: WARN. Below 80%: FAIL. |
ISSO notified. Gap analysis initiated. AO briefed within 48 hours if FAIL. |
| Overdue POA&M Items | POA&M API |
Any CAT I overdue: Immediate escalation. |
ISSO escalates to AO. Remediation sprint initiated. |
| CRITICAL/HIGH CVEs | Trivy scan |
CRITICAL: 7-day remediation. HIGH: 30-day. |
Auto-POA&M creation. ISSO review within 24 hours for CRITICAL. |
| Scan Freshness | Health API |
Last scan older than 24 hours: WARN. |
Investigate scan pipeline. Manual scan if automated cadence failed. |
| AI Model Drift | AI Witness API |
AI-MDL.3 factor_c negative (degradation detected). |
Model review. Potential rollback. ISSO documents in POA&M. |
Per CA-7(f), the following response actions address results of control assessment and monitoring: